Egrets Way Planning Update

The Egrets Way project have applied for planning permission at two locations:

to create a link from Railway Lane (just off Cliffe High Street, Lewes) through the Railway Lands past the Linklater Pavilion, and on to Ham Lane. This will join up to an existing section of Egrets Way that goes from Kingston, past Spring . . . → Read More: Egrets Way Planning Update

A record Year for the Tourers

Tourers brave a wet and windy New Year’s Eve for their final ride of 2017: Lakeside Café at Horam

It’s been another record year for the tourers: 120 touring rides in 2017, an increase of 15% on the 2016 total of 103 rides. There would have been more but some were cancelled due to . . . → Read More: A record Year for the Tourers

Another Super Christmas Meal for the Tourers

Tourers Christmas Meal at the Legion

Another highly convivial time was had by twenty-one of us at the Cycle Seahaven ‘Tourers’ Christmas meal in the British Legion yesterday evening. It was our third year in succession at the Legion so it’s becoming something of a tradition.

That’s hardly surprising as the meal is excellent . . . → Read More: Another Super Christmas Meal for the Tourers

Good news looming on the Newhaven pump track project

from Jon Younghusband

In my last update I discussed the possibility of getting a pump track build at the Salts Field in Seaford. This could still be a possibility but, due to Craig leaving his position and funding being secured for the skate park and not a pump track, it looks like this will need . . . → Read More: Good news looming on the Newhaven pump track project

Winter Touring Rides

The weather is getting colder and Jack Frost has started to visit us. As in previous years, our touring rides will continue throughout Winter on Sunday, Tuesday and Thursday of each week. However, please check the Rides Calendar on the morning of a ride in case there’s been a change.

Changes to rides are more . . . → Read More: Winter Touring Rides

Cycle Seahaven Tourers’ WhatsApp Group

The WhatsApp group for the tourers which was set up about a month ago is working well. It’s proving useful for advising and consulting group members about late changes to rides. Also, group members can invite others in the group to join them on their own (non-Cycle Seahaven) rides.

Most of the regular tourers have . . . → Read More: Cycle Seahaven Tourers’ WhatsApp Group

A27 up-grade – some positive news.

 

Following the publication of the Preferred Route for the eventual Up-grade to the A27 (see http://cycleseahaven.org.uk/a27e2/) members have made representations to various bodies complaining about the lack of north-south crossings on the A27.

 

The following is a response to letters concerning this lack of north-south crossings and the proposed “ghost” crossing at . . . → Read More: A27 up-grade – some positive news.

A Perfect Autumn Cycle Ride

Cyclists outside the Di Paolo Café in Bexhill

Thursday was a superb day, dry and sunny with no wind: the perfect autumn day for cycling. Our destination was Bexhill, one of our favourite destinations for a ride. It’s a virtually flat route apart from Chapel Hill just after the start; in fact roads don’t . . . → Read More: A Perfect Autumn Cycle Ride